|
Aqua
Pools, Ponds & Playthings, LLC |
|
|
|
|
|
|
| This is the main drain line stubbed through the wall. The main drain line should be stubbed through the wall prior to pouring the concrete footer on the outside of the pool wall. |
| Home | |
|
|
|
|
|
|